Back from the long weekend and there was a lot of action down in the basement today. Wally the HVAC installer got started while Paul and the boys framed out everything down there as well. Everything went well, the rooms are a good size and the play space is very generous.
Start of the day
Mid day
End of the day
We lost some space at the front so that we can hide pipes and drains
No comments:
Post a Comment