Along with getting the siding done, we had to finish the installation of our hand rails. Both on the stairs to the basement that I have talked about before but also on our 100 year stairs from the main floor to the second floor.
As required, here is the railing I installed on said stairs. Fancy eh?!
After noting the high quality of the railings I installed, the building inspector inquired "you are keeping these right?". "Of course" I replied... below are the pictures of Penny helping me take the basement railing down the following day.
And this is the fire that I made using the wood from the railings...
And finally, the ceremonial burning of the building permits. After 262 days of construction, it was a very satisfying activity to be sure!
One last post to come, an overview of the project, then my blogging days are over :)